Berkeley Engineering in 2007 installed Caltrans' first bridge anti-icing system on these two Interstate 80 bridges at Yuba Pass.


In 2001 Berkeley Engineering installed a storm drain diversion pumping plant on the beach in Pacific Palisades, California.

The underground chambers were
pre-assembled aboveground and
then grouted in place under water.
The gate well, pump well, and valve
vault were installed beneath the
beach parking lot surface.