Launch Slab with 4" curb and backstop |
|
Box Shield placed on launch slab prior to box construction |
|
Casting the walls and roof of box |
|
|
|
|
|
|
|
Shield entering ground during the beginning of jacking operations |
|
1st half of a 135' Box being jacked under active expressway |
|
Jacks moving the box at the beginning of jacking operations |
|
|
|
|
|
|
|
Box sliding through headwall into ground |
|
Cat 933 driving into box to muck |
|
Extending Thrust Columns after a sequence of jacking |
|
|
|
|
|
|
|
14'x12' box after being jacked into final position |
|
Hole Through of the box (the light at the end of the tunnel) |
|
Photo of another BEC Box Jacking project consisting of a double 12'x10' box |
|